Jinan Zhangqiu District Heat Pump Heating Project
Project overview:This project is located in Zhangqiu District, Jinan City, Shandong Province. It is a coal-to-electricity project of a detention center building. This building needs to design an air source heat pump heating system to meet the indoor heating demand in winter.
Building area:20000 ㎡, floor heating 10000 ㎡, radiator 10000 ㎡
Actual heating area:15000 ㎡
Selection of equipment:90KW ultra-low temperature commercial air source heat pump 15 sets
End conditions:Floor heating radiator
Heating mode operating cost comparison:
Originally, wall-mounted gas boiler was used for heating: 60000 cubic meters of gas was used every month, the third gas price was implemented, 4 yuan/cubic meter was used, and 240000 yuan was consumed every month.
At present, air source heat pump is used for heating: it consumes 123984.8 degrees of electricity per month, 0.8 yuan/degree, and 99,187 yuan per month.
More Cases