Jinan Puji Town Wangjia Village New Rural Reconstruction Project
Construction area: 3000 ㎡
Selection of equipment: 40KW frequency conversion EVI commercial air source heat pump 5 sets
End condition: floor heating fan coil
Basic information of the project: This project is a renovation project for the construction of a new countryside in Wangjia Village. The first floor is for shops along the street, and the second and third floors are for rural households. The total construction area is 3000 square meters, and the heat source adopts 5 sets of 40KW frequency conversion EVI commercial air source heat pump units. Brick-concrete structure, 370mm hollow brick wall, 70mm thick external wall insulation, broken bridge aluminum doors and windows, end heating for floor heating, summer fan coil refrigeration is completed and started to use, winter energy consumption: daily power consumption is about 0.3kw per square meter per day (24-hour operation), frequency conversion unit is energy-saving, electricity-saving and high efficiency.
More Cases