Jinan Huaiyin District Nursing Home Coal to Electricity Project
Construction area: 4000 ㎡
Selection of equipment: 40KW frequency conversion EVI air source heat pump 9 sets
End condition: radiator fan coil
Basic information of the project: This project is a coal-to-electricity conversion project for nursing homes in Huaiyin District, with a total construction area of 4000 square meters. Coal-fired boilers were originally used for heating. In order to meet the national trend of coal-to-electricity conversion, 9 40KW frequency conversion EVI commercial air source heat pump units are now used as heat sources. Brick-concrete structure, 370mm hollow brick wall, 60mm thick exterior wall insulation, broken bridge aluminum doors and windows, end heating for radiator heating fan coil heating, while taking into account the summer central air conditioning refrigeration. It will be completed and used on November 1, 2017. Energy consumption in winter: daily power consumption is about 0.35kw per square meter per day (24-hour operation). The frequency conversion unit is energy-saving and high-efficiency.
More Cases