Jinan Zhangqiu District Heat Pump Heating Project
Construction area: 3000 ㎡ Selection of equipment: 40KW frequency conversion EVI commercial air source heat pump 5 sets End condition: floor heating fan coil Basic information of the project: This project is a renovation project for the construction of a new countryside in Wangjia Village. The first floor is for shops along the street, and the second and third floors are for rural households. The total construction area is 3000 square meters, and the heat source adopts 5 sets of 40KW frequency conversion EVI commercial air source heat pump units. Brick-concrete structure, 370mm hollow brick wall, 70mm thick external wall insulation, broken bridge aluminum doors and windows, end heating for floor heating, summer fan coil refrigeration is completed and started to use, winter energy consumption: daily power consumption is about 0.3kw per square meter per day (24-hour operation), frequency conversion unit is energy-saving, electricity-saving and high efficiency.
Jinan Puji Town Wangjia Village New Rural Reconstruction Project
Construction area: 3000 ㎡ Selection of equipment: 40KW frequency conversion EVI commercial air source heat pump 5 sets End condition: floor heating fan coil Basic information of the project: This project is a renovation project for the construction of a new countryside in Wangjia Village. The first floor is for shops along the street, and the second and third floors are for rural households. The total construction area is 3000 square meters, and the heat source adopts 5 sets of 40KW frequency conversion EVI commercial air source heat pump units. Brick-concrete structure, 370mm hollow brick wall, 70mm thick external wall insulation, broken bridge aluminum doors and windows, end heating for floor heating, summer fan coil refrigeration is completed and started to use, winter energy consumption: daily power consumption is about 0.3kw per square meter per day (24-hour operation), frequency conversion unit is energy-saving, electricity-saving and high efficiency.
Jinan Huaiyin District Nursing Home Coal to Electricity Project
Construction area: 4000 ㎡ Selection of equipment: 40KW frequency conversion EVI air source heat pump 9 sets End condition: radiator fan coil Basic information of the project: This project is a coal-to-electricity conversion project for nursing homes in Huaiyin District, with a total construction area of 4000 square meters. Coal-fired boilers were originally used for heating. In order to meet the national trend of coal-to-electricity conversion, 9 40KW frequency conversion EVI commercial air source heat pump units are now used as heat sources. Brick-concrete structure, 370mm hollow brick wall, 60mm thick exterior wall insulation, broken bridge aluminum doors and windows, end heating for radiator heating fan coil heating, while taking into account the summer central air conditioning refrigeration. It will be completed and used on November 1, 2017. Energy consumption in winter: daily power consumption is about 0.35kw per square meter per day (24-hour operation). The frequency conversion unit is energy-saving and high-efficiency.
Inner Mongolia Erdos Tourism Base Coal to Electricity Project
Construction area: 3200 ㎡ Selection of equipment: 90KW ultra-low temperature air source heat pump 3 sets End condition: floor heating
Shaanxi Tongchuan Municipal Government Office Building Dormitory Heating Project
Construction area: 3100 ㎡ Selection of equipment: 90KW ultra-low temperature air source heat pump 3 sets Use effect: indoor temperature above 20 ℃
Inner Mongolia Baotou City Traffic Police Detachment Heating Project
Construction area: 1200 ㎡ Selection of equipment: 40KW ultra-low temperature air source heat pump 3 sets End condition: floor heating radiator